We're currently constructing.
We're currently constructing.
3M
70MM
140MM
230MM
70MM
140MM
230MM
25MM
50MM
75MM
100MM
1L
5L
6.6KG X 450G - 13M2 COVERAGE
16.5KG X 450G - 32.5M2 COVERAGE
16.5KG X 600G - 25M2 COVERAGE
33KG X 450G - 66M2 COVERAGE
33KG X 600G - 50M2 COVERAGE
75MM X 75M
150MM X 25M
25KG
5KG CAN - 10M2 COVERAGE
ALL BEFORE & AFTER INSTALLATION PDFs
This 18 minute video will take you through a step by step guide to installing a Cure It roof. It includes - The preparation stage; Stage 1 - Installing the New Deck; Stage 2 - Installing the GRP Trims; Stage 3 - Detailing and Bandaging; Stage 4 – Laminating; Stage 5 – Topcoating.
This short video is a guide to preparing a roof ready for the installation of the Cure It GRP Flat Roofing System.
This short video is a guide to installing the new deck for the roof area using OSB T&G 2400mm x 600mm decking boards.
A short video guide on how to apply the GRP trims as part of the Cure It installation process. The following trims are used in this video – A200, B260, C100, D260.
This short video is a guide to the detailing and bandaging stage (stage 3) of the Cure It installation process. It includes bandage preparation, mixing Cure It Resin and ‘wetting-out’ bandage for corners and trim joins.
This short video is a guide to the laminating stage (stage 4) of the Cure It installation process. The most important part of the installation process, this is an in-depth guide to mixing, applying and consolidating the resin and reinforcement mat laminate.
This video guide covers the final stage of the installation process, topcoating (stage 5). It covers preparing the cured laminate, fixing the C100 simulated lead flashing, mixing topcoat, and applying topcoat to the trims and main deck.
How to use the Cure It Mixing Bucket - A quick and easy to follow guide.
This short video guide explains how to GRP a parapet wall using the AT Trim ranges to encapsulate the parapet wall.
This video guide shows how to create an outlet through a parapet wall and into a hopper using Cure It, A Trims, and D Trims from the trim range.
Integrate a Cure It GRP roof with a pitched roof by using flat flashing. This video guide explains how to use the F Trim range at a roof junction.
A collaboration video guide with Velux demonstrating how to install a Velux flat roof window with the Cure It System.
We recommend that you use Cure It EVO when installing a warm roof. This video guide shows how to install a warm roof using the Cure It System.
A common detail on flat roofs is pipe extrusions, this short video demonstrates how to GRP a pipe outlet during the detailing and bandage stage of the installation process.
This video guides covers how to prepare a pipe extrusion in a Cure It roof. It covers how to laminate the inlet during the bandage and matting stage to ensure a watertight finish.
For larger GRP roofs, it’s essential to include expansion joints. This short video guide shows how to install the E280 rasied ridge roll trim. The E280 is compatible with C5 preformed closures to form an enclosed finish.
This video guide demonstrates how to use the C2 preformed corner. The C2 is used where a flat roof meets an abutting wall and is compatible with all A, B and D Trims.
This short video guide explains how to use the C3 internal preformed corner with the D Trim range.
In this masterclass video, the technical team demonstrate how to use flat flashing for GRP to pitched roofs, and how to create a valley detail with an inlet pipe detail.
This video masterclass is a guide to creating walkways and balconies using Cure It. The video includes the laminating stage using the 600g heavy duty reinforcement mat, topcoating and features how to use the C2 preformed corner (where the trim meets abutting wall).
This video guide shows how to create expansion joints required for larger GRP roofs. It includes how to position joists, create expansions using the E280 trim and fitting the C9A preformed corner.
This video demonstrates how to correctly apply topcoat, how to use the Cure It mixing bucket for measuring hardener addition, and how to reapply topcoat to a damaged roof. It also features how to achieve a non slip finish and highlights the various topcoat colour options.
This masterclass video shows how to correctly install a Cure It roof, including what to do if it rains during the installation process.
In this short video, we use a range of trims including flat flashing, G180 gulley trim and AT trims, to show how to GRP a parapet wall, step detail, a gully and a wide gully detail. The detail work is bandaged and laminated for a waterproof finish.
In this masterclass video, Cure It is applied to a concrete surface. Cure It Concrete Primer is used to coat the surface before trims and laminating are applied to cover the concrete.
This masterclass is a guide to preformed corners and GRP Trims. It features how to instal an C3 internal and external preformed corner with a D260 trim, as well as creating internal and external corners by mitring a D260 trim to suit. It shows how to instal a C1 external corner and how to create an external corner using A and B trims. It features using an AT195 trim for lantern detail. It also includes how to install a trim for a bay window.
This video in the masterclass series explores how to bond GRP to other materials including plastic external pipework and lead, showing the detail work required during the bandage and laminating stages.
This short troubleshooting tutorial explains how to repair a damaged section of laminate.
This short troubleshooting video demonstrates how to repair the laminate if it has been contaminated with water or moisture during the laminating stage of installation.
A200 AND AF200 TRIMS (pdf)
DownloadB260 RAISED EDGE TRIM (pdf)
DownloadD260 FILLET TRIM C100 AND SIMULATED LEAD FLASHING (pdf)
DownloadPARAPET WALL WITH AT300 EXTERNAL TRIM (pdf)
DownloadF300 TRIM (pdf)
DownloadPREFORMED CORNERS (pdf)
DownloadCORNER MITRE GUIDE (pdf)
DownloadPREPARING CORNERS, JOINTS, PIPES AND OTHER EXTRUSTIONS (pdf)
DownloadPREPARING REINFORCEMENT MAT FOR MAIN LAMINATE (pdf)
DownloadPREPARING RESIN AND HARDNER (pdf)
DownloadLAMINATING CORNERS, TRIMS, JOINTS AND PIPES (pdf)
DownloadLAMINATING (pdf)
DownloadTOP COATING (pdf)
DownloadFeel free to WhatsApp us at any time. We will respond within our working hours listed below
Mon | 07:30 – 16:30 | |
Tue | 07:30 – 16:30 | |
Wed | 07:30 – 16:30 | |
Thu | 06:30 – 16:30 | |
Fri | 07:30 – 16:00 | |
Sat | 08:00 – 11:30 | |
Sun | Closed |
We will do our best to reply to your message within 24 hours.